











The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map, vehicle dossier and ROI valuation

This one BMW M2 was manufactured in 2016 year. The car is equipped with 3.0L 6 Gasoline engine and Automatic gearbox. The drive is Rear and the body color is Turquoise . The vehicle has 124,936 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Coupe . The model series is 2-series . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " On and running ". The engine has a displacement of 3 liters.and is equipped with the 6 cylinder, developing a power of 365 horsepower. The following damage was found on this vehicle with VIN WBS1H9C55GV786103 : major damage in the area of " Rear End " , as well as additional damage in the area of " Front End " . The unique VIN number for checking the vehicle is WBS1H9C55GV786103 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS1H9C55GV786103 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 72595344 . The physical location of the object is in the city of CONCORD , state of NC ( САЩ ). The procedure is under the sale status “ Direct Sale ”. The last bid during the last auction was $15,200 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $35,275 .
9 % of the M2 cars in the archive have registered damage type " Rear End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $4,515 USD for 2016 M2 serves as a reference for maximum bid before fees, shipping, and repairs are charged.