











The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map, vehicle dossier and ROI valuation

This one BMW M3 was manufactured in 2023 year. The car is equipped with 3.0L 6 Gasoline engine and Manual gearbox. The drive is Rear and the body color is Black . The vehicle has 37,313 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 3-Series . The car modification is M3 . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " On and running ". The engine has a displacement of 3.0 liters.and is equipped with the 6 cylinder, developing a power of 473 horsepower. The following damage was found on this vehicle with VIN WBS53AY02PFR10997 : major damage in the area of " Front End " . The unique VIN number for checking the vehicle is WBS53AY02PFR10997 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS53AY02PFR10997 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 66205225 . The physical location of the object is in the city of AMERICAN CANYON , state of CA ( САЩ ). The procedure is under the sale status “ Direct Sale ”. The last bid during the last auction was $19,300 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $75,275 .
44 % of the M3 cars in the archive have registered damage type " Front End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $22,070 USD for 2023 M3 serves as a reference for maximum bid before fees, shipping, and repairs are charged.