










The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map and financial calculation for approximate repairs

Order the official CARFAX® report to check for actual mileage, hidden defects and insurance events.
This one BMW M3 COMPETI was manufactured in 2021 year. The car is equipped with 3.0L 6 Gasoline engine and Automatic gearbox. The drive is Rear and the body color is Blue . The vehicle has 19,640 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 3-Series . The car modification is M3 Comp . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " On and running ". and is equipped with the 6 cylinder, developing a power of 503 horsepower. The following damage was found on this vehicle with VIN WBS33AY01MFL00141 : major damage in the area of " Side " , as well as additional damage in the area of " Undercarriage " . The unique VIN number for checking the vehicle is WBS33AY01MFL00141 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS33AY01MFL00141 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 50839432 . The physical location of the object is in the city of SAN MARTIN , state of CA ( САЩ ). The procedure is under the sale status “ Direct Sale ”. The last bid during the last auction was $36,000 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $93,917 .
10 % of the M3 cars in the archive have registered damage type " Side ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $15,668 USD for 2021 M3 serves as a reference for maximum bid before fees, shipping, and repairs are charged.