
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map and financial calculation for approximate repairs

Order the official CARFAX® report to check for actual mileage, hidden defects and insurance events.
This one BMW M3 COMPETITION was manufactured in 2024 year. The car is equipped with 3.0L 6 Gasoline engine and Automatic gearbox. The drive is 4x4 and the body color is Green . The vehicle has 31,929 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 3-Series . The car modification is M3 Competition xDrive . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " Probably not running ". The engine has a displacement of 3 liters.and is equipped with the 6 cylinder, developing a power of 543 horsepower. The following damage was found on this vehicle with VIN WBS43AY03RFR99350 : major damage in the area of " Front End " , as well as additional damage in the area of " Undercarriage " . The unique VIN number for checking the vehicle is WBS43AY03RFR99350 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS43AY03RFR99350 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 65049885 . The physical location of the object is in the city of BROOKHAVEN , state of NY ( САЩ ). The procedure is under the sale status “ Minimum Bid ”. The last bid during the last auction was $43,250 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $82,234 .
43 % of the M3 cars in the archive have registered damage type " Front End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $22,742 USD for 2024 M3 serves as a reference for maximum bid before fees, shipping, and repairs are charged.