The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map, vehicle dossier and ROI valuation

This one BMW M4 was manufactured in 2024 year. The car is equipped with 3.0L 6 Gasoline engine and Manual gearbox. The drive is Rear and the body color is Black . The vehicle has 4,674 km mileage and is no keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Coupe . The model series is 4-Series . The car modification is M4 . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " Probably not running ". The engine has a displacement of 3 liters.and is equipped with the 6 cylinder, developing a power of 473 horsepower. The following damage was found on this vehicle with VIN WBS53AZ01RCP13984 : major damage in the area of " Front End " , as well as additional damage in the area of " Rear End " . The unique VIN number for checking the vehicle is WBS53AZ01RCP13984 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS53AZ01RCP13984 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 75922154 . The physical location of the object is in the city of SAN MARTIN , state of CA ( САЩ ). The procedure is under the sale status “ Minimum Bid ”. An instant purchase option ("Buy Now") is available at a fixed price of $25,700 . The last bid during the last auction was $20,500 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $77,741 .
45 % of the M4 cars in the archive have registered damage type " Front End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $21,486 USD for 2024 M4 serves as a reference for maximum bid before fees, shipping, and repairs are charged.