
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map and financial calculation for approximate repairs

Order the official CARFAX® report to check for actual mileage, hidden defects and insurance events.
This one BMW M4 GTS was manufactured in 2016 year. The car is equipped with 3.0L 6 Gasoline engine and Automatic gearbox. The drive is Rear and the body color is Gray . The vehicle has 0 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Coupe . The model series is 4-series . The car modification is GTS . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " ". The engine has a displacement of 3 liters.and is equipped with the 6 cylinder, developing a power of 493 horsepower. The following damage was found on this vehicle with VIN WBS4S9C59GK579018 : major damage in the area of " Engine Burn " . The unique VIN number for checking the vehicle is WBS4S9C59GK579018 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS4S9C59GK579018 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 95462995 . The physical location of the object is in the city of LOGANVILLE , state of GA ( САЩ ). The procedure is under the sale status “ Direct Sale ”. The last bid during the last auction was $15,500 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $87,220 .
We recommend a detailed review of the insurance auction photos in the archive to identify the exact areas of the initial impact.
The historical average price of $11,196 USD for 2016 M4 serves as a reference for maximum bid before fees, shipping, and repairs are charged.