










The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map, vehicle dossier and ROI valuation

This one BMW M5 was manufactured in 2021 year. The car is equipped with 4.4L 8 Gasoline engine and Automatic gearbox. The drive is 4x4 and the body color is Silver . The vehicle has 12,274 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 5-Series . The car modification is M5 / M5 Comp . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " On and running ". and is equipped with the 8 cylinder, developing a power of 600 horsepower. The following damage was found on this vehicle with VIN WBS83CH02MCF23021 : major damage in the area of " Front End " . The unique VIN number for checking the vehicle is WBS83CH02MCF23021 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS83CH02MCF23021 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 40541202 . The physical location of the object is in the city of MARLBORO , state of NY ( САЩ ). The procedure is under the sale status “ Pre-Approval ”. The last bid during the last auction was $34,500 .
38 % of the M5 cars in the archive have registered damage type " Front End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $18,704 USD for 2021 M5 serves as a reference for maximum bid before fees, shipping, and repairs are charged.