











The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map and financial calculation for approximate repairs

Order the official CARFAX® report to check for actual mileage, hidden defects and insurance events.
This one BMW M5 was manufactured in 2022 year. The car is equipped with 4.4L 8 Gasoline engine and Automatic gearbox. The drive is 4x4 and the body color is Red . The vehicle has 64,016 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 5-Series . The car modification is M5 . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " Probably not running ". and is equipped with the 8 cylinder, developing a power of 600 horsepower. The following damage was found on this vehicle with VIN WBS83CH0XNCK98720 : major damage in the area of " Undercarriage " , as well as additional damage in the area of " Front End " . The unique VIN number for checking the vehicle is WBS83CH0XNCK98720 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS83CH0XNCK98720 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 72822924 . The physical location of the object is in the city of PHOENIX , state of AZ ( САЩ ). The procedure is under the sale status “ Minimum Bid ”. The last bid during the last auction was $32,500 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $80,559 .
We recommend a detailed review of the insurance auction photos in the archive to identify the exact areas of the initial impact.
The historical average price of $23,293 USD for 2022 M5 serves as a reference for maximum bid before fees, shipping, and repairs are charged.