
Request removal of the photo gallery, archive prices, and technical information for this car under privacy rights.
Interactive damage map and financial calculation for approximate repairs

Order the official CARFAX® report to check for actual mileage, hidden defects and insurance events.
This one BMW M5 was manufactured in 2026 year. The car is equipped with 4.4L 8 Hybrid engine and N/A gearbox. The drive is 4x4 and the body color is Gray . The vehicle has 7,601 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 5-Series . The car modification is Touring . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " Probably not running ". The engine has a displacement of 4.4 liters.and is equipped with the 8 cylinder, developing a power of 717 horsepower. The following damage was found on this vehicle with VIN WBS83GV07TCX50180 : major damage in the area of " Front End " . The unique VIN number for checking the vehicle is WBS83GV07TCX50180 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS83GV07TCX50180 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 65138086 . The physical location of the object is in the city of HOUSTON , state of TX ( САЩ ). The procedure is under the sale status “ Minimum Bid ”. An instant purchase option ("Buy Now") is available at a fixed price of $62,500 . The last bid during the last auction was $29,500 . The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $133,923 .
38 % of the M5 cars in the archive have registered damage type " Front End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $51,811 USD for 2026 M5 serves as a reference for maximum bid before fees, shipping, and repairs are charged.