










The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
The auction has ended. Request removal of the photo gallery and archive data for this car from the CHECK.VIN catalog.
Interactive damage map, vehicle dossier and ROI valuation

This one BMW M6 was manufactured in 2015 year. The car is equipped with 4.4L 8 Gasoline engine and Automatic gearbox. The drive is Rear and the body color is Silver . The vehicle has 94,935 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Sedan . The model series is 6-Series . The car modification is Gran Coupe . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " On and running ". The engine has a displacement of 4.4 liters.and is equipped with the 8 cylinder, developing a power of 553 horsepower. The following damage was found on this vehicle with VIN WBS6C9C54FD467929 : major damage in the area of " Water / Flood " . The unique VIN number for checking the vehicle is WBS6C9C54FD467929 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS6C9C54FD467929 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 54919232 . The physical location of the object is in the city of HOUSTON , state of TX ( САЩ ). The procedure is under the sale status “ Minimum Bid ”. The last bid during the last auction was $17,300 .
9 % of the M6 cars in the archive have registered damage type " Water / Flood ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $7,823 USD for 2015 M6 serves as a reference for maximum bid before fees, shipping, and repairs are charged.