











Request removal of the photo gallery, archive prices, and technical information for this car under privacy rights.
Interactive damage map and financial calculation for approximate repairs

Order the official CARFAX® report to check for actual mileage, hidden defects and insurance events.
This one BMW M4 was manufactured in 2026 year. The car is equipped with N/A engine and N/A gearbox. The drive is N/A and the body color is Black . The vehicle has 4,295 km mileage and is with keys . According to the manufacturer's original data BMW M GMBH , The model has a coupe type Convertible . The model series is 4-Series . The car modification is Competition xDrive . The vehicle is classified as Passenger Car .
In terms of technical condition and mobility, the vehicle is rated with the status " On and running ". The engine has a displacement of 3 liters.and is equipped with the 6 cylinder, developing a power of 523 horsepower. The following damage was found on this vehicle with VIN WBS43BA08TCV63084 : major damage in the area of " Rear End " . The unique VIN number for checking the vehicle is WBS43BA08TCV63084 . We strongly recommend that you do a full history check by ordering CARFAX history report for WBS43BA08TCV63084 This way you can check for actual kilometers (mileage), previous incidents, crashes, insurance damage, theft, and number of previous owners in the US or Canada.
The bidding for the vehicle is conducted through an auction under lot number 57423066 . The physical location of the object is in the city of SUN VALLEY , state of CA ( САЩ ). The procedure is under the sale status “ Direct Sale ”. The estimated retail value of a similar vehicle in working order on the US or Canadian market is approximately $88,787 .
9 % of the M4 cars in the archive have registered damage type " Rear End ". Compare the photos from the auction with the current condition for hidden damage to the geometry.
The historical average price of $27,937 USD for 2026 M4 serves as a reference for maximum bid before fees, shipping, and repairs are charged.